East Africa

Rural Drinking Water Supply and Sanitation Programme - NEAR (First Sub-programme)

This report is based on four components: (i) an analysis of the various documents available; (ii) interviews with the key actors; (iii) field visits; (iv) direct observations at water supply points and latrines; and (v) a mini-survey conducted among the programme beneficiaries. The analysis is essentially based on a comparison between the current and pre-project situations.

Evaluation of Policy based lending in AfDB, 1999-2009 - Country Case Study: Tanzania

This country case study of Tanzania is one of a series of case studies that have been undertaken as part of an independent evaluation commissioned by the African Development Bank (AfDB) of the AfDB’s Policy Based Operations (PBOs).The aim is to support policy and institutional reforms that promote economic growth and poverty reduction. PBOs include balance of payments support, sectoral adjustment lending to support reforms in specific sectors, policy based lending for governance, general budget support and sector budget support. This evaluation has been designed to examine the application of PBOs used by the Bank over the period 1999–2009.

Evaluation of Policy based lending in AfDB, 1999-2009 - Country Case Study: Rwanda

This country case study of Rwanda is one of a series of case studies that have been undertaken as part of an independent evaluation commissioned by the African Development Bank (AfDB) of the AfDB’s Policy Based Operations (PBOs). The aim is to support policy and institutional reforms that promote economic growth and poverty reduction. PBOs include balance of payments support, sectoral adjustment lending to support reforms in specific sectors, policy based lending for governance, general budget support, and sector budget support. This evaluation has been designed to examine the application of PBOs used by the Bank over the period 1999–2009.

Uganda: Joint IEG/OPEV Country Assistance Evaluation, 2001-2007

This joint Country Assistance Evaluation (CAE), prepared by the Independent Evaluation Group (IEG) of the World Bank (WB) and the Operations Evaluation Department (OPEV) of the African Development Bank (AfDB), reviews the assistance provided by the WB and the AfDB to Uganda during 2001-07. Since the assistance provided by the two banks was not joint, the report examines whether: (a) the objectives of the assistance of the two banks were the “right” ones given the country context and the mandate of each bank; (b) the designs of the banks’ assistance programs were appropriate, effective, and consistent with their associated objectives; and (c) the program and interventions of each bank achieved their objectives and contributed (or likely to contribute) to the intended outcomes.

Ethiopia: Review of Bank Group Assistance to the Multi-sector, 1992-2004

The evaluation will serve as an input into a larger evaluation of Bank’s overall assistance to Ethiopia. Thus it is a comprehensive review of Bank’s operations in support of macroeconomic stabilization, adjustment, institutional reforms, and capacity building in Ethiopia, covering all completed project in the sector. Some preliminary views will also be expressed on the performance of on-going projects. The evaluation focuses on Bank’s products and services, the achievement of objectives of those products and services, their efficiency, the sustainability of the achievements, their institutional development impact as well as economywide impact. The performance of development partners (the Bank, government of Ethiopia and other donors) is also assessed.

Ethiopia: Review of Bank Group Assistance to the Agriculture and Rural Development Sector, 1993-2004

The review covers the lending and non-lending interventions in the sector since 19931. The policy context within which these projects have operated is first described. The standard evaluation criteria of the Bank Group are then applied separately for lending and non-lending activities to assess the outcome (relevance, efficacy and efficiency), institutional development and sustainability (see annex A4). To the extent that the available evidence permits, the review attempts to show the contribution of the Bank Group and that of the GOE to the performance outcome. Finally, the review draws lessons learned and provides recommendations for enhancing the development effectiveness of the AfDB intervention in Ethiopian agriculture.

El Nino Infrastructure Rehabilitation

At appraisal, the project components were selected from an inventory of all the destruction caused by the “El Nino” which had been prepared by the relevant government ministries with the assistance of the affected communities and United Nations agencies in Kenya. The key priorities were – reversal of life threatening situations; restoration of essential human services; restoration of vital economic functions and of life-line roads to cut off areas; and the protection of economic assets at risk. The project had four physical and one institutional component. The physical components were i) provision of chemicals, ii) the replacement of components in the national water resources monitoring network, iii) replacement and repair of components and machinery on the water supply system, and iv) the repair of 74 different category of roads. The fifth component was for consultancy services for the final designs, supervision of works, and technical, financial and management audits. See Annex 1

Ethiopia: Review of Bank Group Assistance to the Public Utility Sector, 1975-2004

The Bank Group assistance in the public utility sector in Ethiopia commenced in 1975. The scope of the review covered all operations since then to 2004. The review is based on available documents and on findings of a field mission. The review was segmented into two periods: those financed up to 1995 in the pre-CSP period and those financed during the CSP era beginning 1996. The three CSPs covered the periods 1996-1998, 1999-2001 and 2002-2004.