06-August-2026
Roads are much more than bitumen and concrete; they shape how people trade, travel, and access services. In West Africa, the Senegambia Bridge transformed a critical ferry crossing, which caused long waits and delays, into an economic artery for The Gambia and Senegal.
Assessing impact beyond the numbers
To understand the full impact of the investment, IDEV conducted an in-depth case study of the Trans-Gambia Corridor as part of its evaluation of the African Development Bank’s Country Strategy and Program in The Gambia (2017–2024). This approach included cost-benefit analysis to assess economic returns, consultations with a wide range of stakeholders, and field visits along the corridor.
A strategic imperative for integration
The Gambia has a unique geography: a narrow country divided into two parts by the Gambia River and almost entirely surrounded by Senegal. This natural divide has long constrained connectivity and created a bottleneck for regional trade along the Dakar-Lagos corridor.
Approved in 2011 by the African Development Bank (AfDB), the Trans-Gambia Corridor Project (TGCP) aimed to replace the ferry crossing with a permanent bridge and improve transport infrastructure along the corridor. Inaugurated in January 2019, the bridge aligns with one of the Bank’s High 5 priorities: “Integrate Africa”, and seeks to strengthen regional integration, reduce transport costs, and facilitate cross-border trade.
According to the case study, the project has significantly improved regional mobility and trade, with particularly strong impacts observed in Senegal.
A breath of fresh air for Casamance
While providing essential internal connectivity for The Gambia, the bridge has served as a catalyst for the Casamance region in Senegal. Long isolated, the region can now move products such as maize, rice, and mangoes more efficiently to markets in Dakar and across the sub-region, contributing to increased bilateral trade between the two countries in recent years. As highlighted in the case study, these impacts have been particularly strong in Senegal, while benefits in The Gambia are still emerging.
"Before the bridge, crossing was a gamble: you could wait for hours, sometimes an entire week. Today, it is a strategic link fostering seamless regional integration. For our agriculture, it is a rebirth; Casamance is no longer isolated.”
Based on testimonies from transporters and traders in Ziguinchor.
Designing infrastructure for and with communities
The case study goes beyond highlighting successes; it also draws out key lessons on how infrastructure design shapes benefits for communities:
Design Quality and Community Access: Gaps in the initial design underestimated challenging terrain conditions and contributed to cost increases of up to 30% and nearly a decade-long implementation delay. These delays affected the timely delivery of benefits to communities, highlighting how sound technical design is essential to ensure that infrastructure serves people effectively.
Connecting Communities to Markets: The case study found that core infrastructure needs to be better connected to local economic activities. The lack of feeder roads and the limited use of local markets constrained communities’ ability to fully benefit from improved connectivity, underscoring the importance of complementary measures for inclusive growth. Simultaneously, the evaluation noted unintended increases in the number of checkpoints, customs inefficiencies and cross-border tensions, which continue to influence the full realization of benefits.
Sustainability through Partnerships: While Public-Private Partnerships (PPP) show promise for maintenance, their effectiveness depends on strong legal frameworks and transparency. This is critical to ensure that infrastructure remains reliable and continues to serve communities over the long term, and the evaluation recommended a greater emphasis on requiring strong legal and institutional frameworks to realize PPP successes.
Key takeaways
The project has significantly improved regional mobility, with crossing time reduced from around 79 minutes by ferry to just one and a half minutes via the bridge.
The project delivered strong economic performance, with an Economic Internal Rate of Return (EIRR) of 27.8%, significantly surpassing the initial estimates during the project appraisal. Beyond transport, the removal of key bottlenecks has supported increased trade and agricultural production in the region, particularly in Casamance. Traffic along the corridor quadrupled after the bridge’s completion, reflecting a substantial increase in the movement of people and goods across the border.
The project highlights the potential of such investments to generate tangible economic and social benefits, while also underscoring the importance of sound design, complementary measures, and effective implementation to fully realize their impact.
- To explore the full findings, lessons and recommendations, read the Evaluation of AfDB’s Country Strategy and Program in The Gambia (2017–2024) and the Case Study of the TransGambia Corridor Project
- For further information, please contact: Akua Arthur-Kissi, Evaluation Task Manager and Principal Evaluation Officer at [email protected], and Christoffer Claussen, Senior Evaluation Officer at [email protected]