Benin: Evaluation of the AfDB Country Strategy and Program (2012-2021)

Independent Development Evaluation (IDEV) at the African Development Bank (AfDB or "the Bank”) conducted an evaluation of the Bank's country strategies and programs in Benin over the 2012-2021 period. Over the decade, the Bank approved 31 projects, for a total of UA 688.13 million, in the infrastructure, energy, water and sanitation, agricultural, and governance sectors.

Evaluation of Mainstreaming Green Growth and Climate Change into the AfDB's Interventions: Energy and Transport Cluster

This project cluster evaluation of the African Development Bank’s (AfDB or “the Bank”) support for and mainstreaming of Green Growth and Climate Change (GG-CC) into its energy and transport interventions is a building block in the overall corporate evaluation of mainstreaming GG-CC into the AfDB's interventions. It covers seven energy and transport projects in five countries: Cameroon, Morocco, Mozambique, Rwanda and Senegal, for a total value of UA 394.4 million.

Strengthening Agricultural Water Management to Feed Africa

Independent Development Evaluation at the African Development Bank (the Bank) has conducted a cluster evaluation of nine agricultural water management projects that were approved and implemented by the Bank in seven African countries from 2005 to 2016. With a total net approval amount of UA 150 million, the projects sought to improve irrigation, drainage and flood control, water conservation and storage, and on-farm water management. The agriculture and rural development sector has been a priority for the Bank in supporting livelihoods.

Reaching the most vulnerable: Scaling Up Service Delivery in Urban Water Supply and Sanitation

Independent Development Evaluation (IDEV) at the African Development Bank (AfDB) has conducted an evaluation of 15 Urban Water Supply and Sanitation (UWSS) projects that were approved and implemented by the Bank in 12 Regional Member Countries over the period 2001-2016. The projects aimed to contribute to poverty alleviation through reduction of productive time wastage; a reduction in healthcare costs; an increase in industrial and commercial activities; and the generation of employment opportunities in targeted areas.

Impact Evaluation of AfDB-Funded Ghana Fufulso-Sawla Road Project

The objectives of this impact evaluation were: (i) to estimate the impacts of AfDB-supported integrated infrastructure projects on key intermediate and long-term outcomes; (ii) to identify explanatory factors that affect the development outcomes of the project; and (iii) to generate lessons and provide recommendations for improving the impacts of integrated infrastructure interventions.

Mali: Evaluation of the AfDB Country Strategy and Program (2005-2019)

Independent Development Evaluation (IDEV) has conducted an evaluation of the African Development Bank’s (AfDB or "the Bank") Country Strategy and Program in Mali for the period 2005-2019. The evaluation covered 109 operations with a total value of nearly UA 1 billion, of which 64 operations approved between 2005 and 2019, and 45 operations approved before 2005 and completed or closed between 2005 and 2019. 

West Africa RISP Completion Report Validation

Independent Development Evaluation (IDEV) at the African Development Bank (AfDB of "the Bank") conducted a pilot validation of the completion report for the West Africa Regional Integration Strategy Paper (WA-RISP) 2011-2015/17. The validation was undertaken to inform the design of the pillars of the new West Africa RISP for 2019-2025, and to add to IDEV’s understanding of how to design and implement this product to best serve its purpose(s). It also contributed to improving the quality of the WA RISP completion report and provides an opportunity for learning.

Guinea Bissau: Mid-Term Evaluation of the AfDB Country Strategy and Program (2015-2019)

Independent Development Evaluation (IDEV) at the African Development Bank (AfDB or "the Bank") has conducted its first ever mid-term evaluation, that of the AfDB Country Strategy and Program in Guinea-Bissau for the period 2015–2019. Implemented in a context of fragility, the Strategy aims to contribute to national stability and economic recovery through two pillars: strengthening the foundations of the State and building infrastructure that promotes inclusive development.

Spurring local socio-economic development through rural electrification: cluster evaluation

This cluster evaluation assesses the effectiveness of 6 out of the 18 rural electrification investment projects funded by the African Development Bank between 1999 and 2013, amounting to about USD 290 million. The projects cover five countries: Benin, Ethiopia, the Gambia, Mozambique and Tunisia. The selection of rural electrification as one of the evaluation themes is due to the fact that it has a pronounced impact on the majority of Africans living in rural and sub-urban areas.

Powering Africa Through Interconnection: Cluster Evaluation Report

The evaluation of AfDB-funded power interconnection projects covers a cluster of energy sector operations approved by the Bank during the period 1999-2013. The selection of power interconnection was driven by the fact that it can significantly contribute to regional integration and help reduce the cost of electricity generation, thereby improving the overall energy supply in Africa. During the period under study, the Bank approved 48 projects related to power interconnection, amounting to UA 822 million.